INFORSE-Europe logo

Search on the site:
 
Facebook INFORSE Facebook INFORSE-Europe CAUSE: 100% RE  INFORSE Twitter
EnglishSpanish French Hungarian Slovak Polish German
 
About Us Contact Us Member Database Contact Database Support Us
PortugueseRomanian Turkish Bulgarian Macedonian Russian Danish
ACTIVITIES
  100% Renewables
Seminars & Events
  Projects
  LCS Network
PUBLICATIONS
  Press Releases
  Newsletter
  Reports
POLICY
United Nations
European Union
  Nuclear Energy
  Gender
  Structural Funds
EDUCATION

 

School Resources
  DIERET
  Study tours 
  Success Stories 
  Test yourself Quiz
  Useful Links
VISIT INFORSE.ORG

PORTUGAL (1991-2007 period)

SF main

Countries Solar Wind Hydro Bio Geo Efficiency

Windpower Projects:

Wind Farms at the Seaside - Sines

Short description: In 1991 was built a wind farm facing the sea in a seven hectare situated 3 km from the sea at the town of Sinesthe. The park consists of 12 wind turbines, distributed in three groups of four. Each turbine is 150 kW and the annual output of the wind farm is around 2.5 million kWh, equal to the energy consumption of the town of Sines (not counting industrial consumption).
Total project cost: 280,000 EUR
EU contribution: 190,000 EUR

More information: Go to Windpower Projects


Hydropower Projects:

Madeira Develops Hydropower for Use All Year Round

Short description: The Madeira´s hydroelectric station has been transformed into a reversible system which allows water and energy production all year round regardless rainfall, thus allowing the growth of the tourism sector.
Time period: 2004 - 2007
EU contribution: 17,300,000 EUR

Making the Sea Our Servant, Not Our Master

Short description: The project focused in the construction and maintenance of a wave power station in Pico Island, a region with high advantages for wave power, resulting in the most important asset of this kind in Europe
Time period: 1992-1999 and 2005-2007
EU contribution: 2,000,000 EUR

More information: Go to Hydropower Projects


Geothermal Projects:

The Soft Energy of Volcanoes

Short description: Two geothermal power plants were build and one was rebuilt in Madeira, reducing the energy dependence of the island, which will have an expected production of 38% of the electricity supplies in 2007 coming from geothermal power.
Time period: aprox.1991-1999
Total project cost: 19,616,864 EUR
EU contribution:
9,808,432 EUR

More information: Go to Geothermal Projects

Back to Structural Fund for Database Main Page